BidIntel — Preconstruction Leveling Matrix

Multimodal BOQ extraction, scope gap detection, and normalized bid leveling copilot for commercial general contractors.

PROJECT RMC-2608 • HEALTHCARE OUTPATIENT

Riverfront Medical Center

Package: 26 00 00 – Electrical Systems • Due Date: 18 Sep 2026 • BOQ Rev: 3.2

Lowest Quoted Bid
$795,000
Summit Power (Deceptive Low)
True Normalized Lowest
$840,000
Atlas Electrical (Full Scope)
Identified Cost Exposure
+$183,100
Unquoted GST + Scope Gaps
Copilot Scope Audit
2 Critical Gaps
Evidence linked from proposals

Bid-Leveling Matrix

Filter rows or click badges to compare scopes
Scope Requirement Atlas Electrical
Quoted: $840,000
VoltWorks Cont.
Quoted: $810,000
Summit Power
Quoted: $795,000
Temporary Power ✓ INCLUDED ✓ INCLUDED ✓ INCLUDED
Testing & Commissioning ✓ INCLUDED ✓ INCLUDED ✗ EXCLUDED (+$18k)
18% GST Compliance ✓ INCLUDED ✓ INCLUDED ✗ EXCLUDED (+$143.1k)
Fire Alarm Integration ✓ INCLUDED ? CLARIFY ✓ INCLUDED
Warranty Period 24 Months 24 Months 12 Mo (+22k)
⟷ Scroll table horizontally for all details
Leveling Recommendation

Summit Power's initial quote appears $45,000 cheaper, but normalized scope analysis reveals unquoted GST and testing exclusions add +$183,100. Awarding to Atlas Electrical prevents mid-flight cost overruns.

Precon Copilot Feed

Automated proposal audit evidence
ACTIVE
Copilot Audit Note: Ingested 3 PDF bids (148 total pages). Flagged 2 major scope exclusions in Summit Power's §3.4 and §5.1.
Action Recommended: Submit RFI #EL-04 to Summit Power regarding testing & commissioning fee exclusions before awarding package.